DiCo from the job
The DiCo, drafted from the job
From a finished job and its quote, Velito drafts the conformity declaration (DiCo) on the DM 37/2008 model. You check every field, complete it and sign it.
Declaration of conformity
DM 37/2008 · Plumbing installation
- Company
- Idraulica Rossi
- Client
- Laura B.
- Installation
- Plumbing
- Materials
- Mixer tap, fittings, seals
- Standards
- UNI 9182
Declarant's signature
How it works
- 1
From the job
Company, client, premises and materials come from your details, the job and the quote you've already done.
- 2
On the decree's model
It follows the DM 37/08 model (Allegato I): system type from a) to g), kind of work, technical standard, attachments.
- 3
You check and sign
You tick the declarations yourself, only if they're true. The PDF says “Bozza – da verificare prima della firma” (draft, check before signing) on every page.
What's inside
- The installer's company details, from your settings
- System type, letters a) to g), and kind of work
- Client, address and what the building is used for
- Technical standard: Velito suggests the usual one, you check it
- Materials from the quote, to complete with brand and certifications
- Mandatory attachments to tick and complete
- A PDF marked as a draft on every page
Questions
Velito prepares a draft on the DM 37/08 model, not a finished document. Its validity depends on your check, your signature and your qualifications, as it does today.
No, never. You download the PDF, check it, sign it and hand it over yourself, wherever it's needed.
All the ones in DM 37/08: electrical, radio, TV and electronic, heating and air conditioning, water and sanitary, gas, lifts, fire protection. Velito suggests your trade's, and you change it if needed.
Do your next quote by voice.
Try Velito free. No card required, and during the preview everything's included.